Short answer: yes, you can usually remove a load-bearing wall in a Philadelphia home, including a row house. A structural engineer designs a beam and posts that carry the load down to the foundation, a contractor shores the floors above, and L&I issues a building permit before work starts. The wall itself comes out in a day; design and permits take most of the time.
How to tell if a wall is load-bearing
Only an engineer can confirm it, but these clues help:
- Joists run across the wall. If the floor joists above sit on the wall, rather than running parallel to it, it is probably carrying load.
- There is a beam or wall right below it. A girder or wall in the basement under the wall is a strong sign.
- It is near the middle of the house. In wider homes, a center wall often supports the joists from both sides.
- Walls stack above it. A wall on the floor above, in the same spot, often bears on it.
- It is a party wall. In Philadelphia row houses, the brick party walls carry the floors and roof. They cannot be removed.
- It is around the stairs. Stair walls often carry the headers that frame the stair opening.
Not sure about your wall? Our team and a Pennsylvania-licensed engineer can check it during one site visit. See our structural engineering and repair service.
Beam options: dropped, flush, wood or steel
The engineer chooses the beam based on the span, the load and the look you want:
- Dropped beam. Hangs below the ceiling. Simpler and usually cheaper.
- Flush beam. Sits up in the ceiling so the ceiling stays flat. Joists are hung from the beam with hangers, which takes more work.
- Engineered lumber (LVL). Common for most residential spans. Light enough to carry in by hand.
- Steel beam. Used for long spans, heavy loads or when the beam must be shallow.
The load does not stop at the beam. Posts at each end carry it down, and the engineer checks that there is a solid path all the way to a footing in the basement. New footings are common in older homes.
Permits and inspections in Philadelphia
Removing a load-bearing wall is structural work, so it needs a building permit from L&I. Structural work also needs a licensed design professional, so the engineer’s drawings or calculations go with the application. A licensed Philadelphia contractor does the work, and L&I inspects it before the ceiling and walls are closed.
The City lists about 20 business days to review an alteration building permit, so plan for the permit to take longer than the construction. See our permit expediter service and Philadelphia permit fees.
What happens on removal day
Once the permit is issued, the work goes in this order:
1. Protect the house
Floors, furniture and the HVAC system are covered against dust.
2. Build temporary walls
Shoring walls on both sides hold up the joists while the wall is out.
3. Remove the wall
Drywall or plaster comes off, and any wiring, plumbing or ducts are rerouted.
4. Set the beam and posts
The new beam goes in, posts carry it down, and footings are added if needed.
5. Inspection and finish
After the inspection, we patch the ceiling, walls and floor where the wall stood.
What affects the cost
No two walls cost the same. The main factors:
- Span and load. Longer spans and more floors above need bigger beams.
- Flush or dropped beam. Flush beams take more labor.
- What is inside the wall. Plumbing stacks, gas lines and ducts are the most expensive to move.
- Footings. New footings in the basement add work.
- Finishes. Matching old plaster, flooring and trim takes time.
We give you one written estimate that lists engineering, permit and construction separately.
Planning an open floor plan?
We coordinate the engineer, file the permit and remove the wall safely. Philadelphia contractor license #43984.
Load-bearing wall removal FAQs
Can you remove a load-bearing wall in a Philadelphia row house?
Usually, yes, for interior bearing walls. The brick party walls between row houses carry the floors and roof and cannot be removed.
Do I need a permit to remove a load-bearing wall in Philadelphia?
Yes. It is structural work, so L&I requires a building permit supported by a licensed design professional’s drawings or calculations.
How long does it take?
The wall removal and beam usually take 1 to 3 days. Engineering and the permit take longer; the City lists about 20 business days to review an alteration permit.
Wood or steel beam?
Engineered lumber works for most homes. Steel is used for long spans, heavy loads or when the beam must be shallow.
Can a 203(k) loan pay for it?
Structural work generally needs the Standard 203(k). We can price it for your loan.
Related guides and services