Make Safe Permit in Philadelphia
Got an Unsafe or Imminently Dangerous violation from L&I? MatrixGC is Philadelphia's make safe permit specialist. We coordinate the engineer's report, file your make safe permit, make the repairs and close out the violation, before the deadline and before the City steps in.
- Licensed & insured, Phila. license #43984
- Engineer reports coordinated
- Permit, repairs and inspections
- Fast response
Make safe permits at a glance
When L&I posts an Unsafe or Imminently Dangerous violation, the clock starts. These are the numbers that matter:
What is a make safe permit?
A make safe permit is the permit Philadelphia's Department of Licenses and Inspections (L&I) requires to repair a structure it has marked Unsafe or Imminently Dangerous. Its job is narrow: remove the dangerous condition and make the building safe again, fast.
Common reasons we get called: a bowing or collapsing front or party wall, a failing bay window, rotted or broken floor joists, a damaged roof after a fire or storm, a leaning chimney, or a building next to a collapse or demolition.
Photo by RPM FX on Unsplash
Imminently Dangerous (ID)
The code official believes the building is an immediate danger to the people inside or the public.
Typical deadline: about 10 days to comply. Work must start within 10 days of the permit being issued.
Unsafe (U)
The building fails the minimum standards of the Property Maintenance Code.
Typical deadline: up to 35 days to comply. Work must start within 30 days of the permit being issued.
Why Philadelphia owners call MatrixGC first
Make safe permits are urgent, technical and unforgiving. We are a Philadelphia-licensed general contractor (license #43984) and permit team that handles them start to finish, so you deal with one company instead of an engineer, an expediter and a contractor who never talk to each other.
- One call, one team. We coordinate the engineer, file the permit, do the repairs and close out the violation.
- Fast response. We review your violation notice as soon as you send it and plan around your L&I deadline.
- Applications L&I does not send back. We assemble the engineer's report, forms and scope so review goes through the first time.
- Real construction crews. Shoring, structural framing, masonry and roofing by our licensed team.
- We know what comes next. After the make safe work, we can renovate, rebuild or prepare the property for sale or a 203(k) loan.
Deadlines you cannot miss
- Appeal within 6 days. If you plan to appeal the violation, it must be filed within 6 days of the notice, according to the City. An appeal does not stop enforcement.
- Answer L&I within 10 business days. If L&I asks for more information during review, the answer is due in 10 business days, or the application is usually abandoned.
- Pick up the permit within 10 days. Approved permits must be picked up within 10 days.
- Start work on time. Within 10 days of issuance for an Imminently Dangerous violation, within 30 days for Unsafe, and keep working until the building is safe.
- After the deadline, the City can act. L&I can move to vacate or demolish the building as soon as reasonably possible after the compliance period ends.
What L&I needs for a make safe permit
We prepare and file everything for you. A typical make safe application includes:
- Engineer's report or plans. A report from a Pennsylvania-licensed engineer, with a physical assessment, photos and a remediation plan with construction details. L&I accepts a report in place of full plans.
- Contractor narrative for minor work. For small repairs, such as replacing under 10% of the joists, repairing a bay or removing a one-story shed, a contractor narrative can be enough, unless the notice requires an engineer.
- Protection of adjacent property. A form and special inspections when the work could affect the buildings next door.
- Special inspection statement. Plus the special inspector's agreement when special inspections are required.
- Supporting forms. Structural design criteria (or loads listed in the report), a waste hauler form, and an asbestos inspection report for larger buildings and projects.
- Owner details and scope. Current owner information, a clear scope of work, and a deed or settlement sheet if the property sold recently.
Who is allowed to do make safe work
L&I sets clear rules on who can design and build make safe repairs:
- A licensed design professional is required when the work costs more than $25,000, is structural, triggers protection of adjacent property, or when the violation notice calls for one.
- A Philadelphia-licensed contractor is required, with limited exceptions for one- and two-family homes.
- A licensed excavation contractor is required for excavation more than 5 feet below the neighboring grade, including underpinning.
MatrixGC holds a Philadelphia contractor license (#43984) and works with Pennsylvania-licensed engineers on every structural make safe job.
Photo by Andrew Knechel on Unsplash
How we get your make safe permit, step by step
1. Send us the notice
Call or text a photo of the violation. We confirm the violation type and your deadline right away.
2. Site visit and stabilizing
We inspect the building and, if needed, install temporary shoring or protection right away.
3. Engineer’s report
We coordinate a Pennsylvania-licensed engineer to assess the structure and design the repair.
4. File with L&I
We assemble the application and book the L&I appointment to apply in eCLIPSE.
5. Repairs and inspections
We do the work and schedule the initial, progress and any special inspections.
6. Close out
The engineer certifies the building is safe, the final inspection passes and the permit is closed.
What a make safe permit covers, and what it does not
A make safe permit is limited to fixing the dangerous condition. A few rules shape every project:
- Bigger than a repair becomes demolition. If more than two-thirds of the framing members are being replaced along with changes to an exterior wall, L&I requires a full demolition permit instead.
- Other permits wait. You can apply for other permits, but L&I will not issue them until the make safe work is complete and the permit is closed.
- Inspections are mandatory. An initial inspection before work starts, progress inspections at checkpoints, and special inspections when protection of adjacent property applies.
Planning to renovate after the repair? We can design the full project now, so it moves the day the make safe permit closes. See our permit expediter and general contractor services.
Who we help
- Homeowners with a sudden wall, roof or floor failure.
- Landlords and property managers who need tenants safe and the violation cleared.
- Investors and buyers of distressed or vacant properties, including 203(k) buyers.
- Estates and heirs who inherited a building with open violations.
- Neighbors whose property was damaged by a collapse or a demolition next door.
Get help with your make safe permit today
Tell us about the violation. We reply fast, confirm your deadline and set up a site visit.
Make safe permit FAQ
What is a make safe permit in Philadelphia?
A make safe permit is the permit L&I requires to repair a building it has cited as Unsafe or Imminently Dangerous. It covers the work needed to remove the dangerous condition, such as shoring, structural repairs or removing a failing part of the building.
What is the difference between Unsafe and Imminently Dangerous?
An Imminently Dangerous (ID) violation means the code official believes the building is an immediate danger to occupants or the public. An Unsafe (U) violation means the building fails minimum property maintenance standards. ID violations usually come with about 10 days to comply, Unsafe violations about 35 days.
How fast can you get a make safe permit?
L&I targets about 5 business days for review, and a complete engineer's report can sometimes be reviewed during the permit appointment. We move fast on our side: site visit, engineer's report and a complete application, so the City has nothing to send back.
Do I need an engineer for a make safe permit?
Usually, yes. A Pennsylvania-licensed design professional is required when the work costs more than $25,000, is structural, triggers protection of adjacent property, or when the violation notice requires one. Some minor repairs can be permitted with a contractor narrative instead. We coordinate the engineer for you.
Can I appeal an Unsafe or Imminently Dangerous violation?
Appeals must be filed within 6 days of the notice, according to the City, and filing an appeal does not stop enforcement. In most cases the faster and safer path is to get the make safe permit and fix the condition.
What happens if I ignore the violation?
After the compliance period, L&I can move to vacate the building or demolish it, and you can face fines. Once the City starts its own abatement, a court order is needed to stop it.
Can I renovate the property after the make safe work?
Yes. Other permits can be applied for, but L&I will not issue them until the make safe work is finished and the permit is closed. We can plan both together, including a full renovation or a 203(k) rehab.