Do You Need a Structural Engineer’s Report for a Make Safe Permit in Philadelphia?

By Matrix Team, MatrixGC Team

}

11.21.2026

Short answer: usually, yes. L&I requires a Pennsylvania-licensed design professional when the make safe work is structural, costs more than $25,000, affects the neighboring property, or when the violation notice calls for one. The good news: a complete engineer’s report can replace full construction drawings and can often be reviewed while you wait.

$25,000Above this cost, a design professional is required
PA-licensedThe engineer must hold a Pennsylvania license
Same dayIn-person review possible with a complete engineer’s report
10 daysTo answer L&I if they ask for more information

When L&I requires an engineer

For a make safe permit, a licensed design professional is required when any of these apply:

  • The work is structural. Walls, joists, beams, roofs, foundations and shoring.
  • The work costs more than $25,000. Even if it is not structural.
  • Protection of adjacent property applies. The work could affect the building next door.
  • The violation notice says so. If the notice requires an engineer, you need one regardless of the size of the job.

When a contractor narrative is enough

For small, simple repairs, L&I can accept a written narrative from the contractor instead of an engineer’s report, unless the notice requires an engineer. Examples in the City’s guidance include replacing less than 10% of the floor joists, repairing a bay window, or removing a one-story shed. The narrative describes the condition, the repair and how the work will be done safely.

What a good engineer’s report includes

An engineer’s report takes the place of full plans, so it needs enough detail for L&I to approve the work and for the contractor to build it:

  • A physical assessment. What the engineer inspected and the condition found.
  • Photos. Showing the dangerous condition and its location.
  • A remediation plan. Exactly what will be repaired, removed, shored or rebuilt.
  • Construction details. Member sizes, connections, anchors and the order of work.
  • Design loads. Structural design criteria, either on the City’s form or listed in the report.
  • Special inspections. When required, the statement of special inspections and the inspector’s agreement.

Historic properties need Philadelphia Historical Commission approval before the permit is issued.

How the engineer fits into the process

On a typical make safe job, the steps run like this:

1. Site visit

The contractor and engineer inspect the building, and temporary shoring goes in if needed.

2. Report

The engineer writes the report and repair details, usually within days for urgent cases.

3. Permit application

The owner or an agent files with L&I, with the report, scope of work and owner information.

4. Inspections during the work

L&I does an initial inspection and progress inspections, plus special inspections when required.

5. Final certification

The engineer confirms the work was done as designed and the building is safe, so the permit can close.

Need an engineer fast? MatrixGC works with Pennsylvania-licensed engineers on every structural make safe permit job, and handles the filing, repairs and inspections. Call (215) 501-7566.

Tips to avoid delays

Most delays come from incomplete applications. To keep things moving:

  • Send the engineer your violation notice. The report should answer every item on it.
  • Have owner details ready. Current owner information, and a deed or settlement sheet if the property sold recently.
  • Answer L&I fast. If L&I asks for more information, the answer is due within 10 business days, or the application can be abandoned.
  • Use one team. When the contractor and engineer work together, the repair plan matches what can actually be built.

Need an engineer’s report and a make safe permit?

We coordinate the engineer, file the make safe permit, do the repairs and close it out. Philadelphia contractor license #43984.

Call (215) 501-7566

Engineer’s report FAQs

Do I need an engineer for a make safe permit in Philadelphia?

Usually yes: when the work is structural, costs more than $25,000, affects the adjacent property, or the notice requires one. Some minor repairs can use a contractor narrative.

Can an engineer’s report replace plans?

Yes. L&I accepts a Pennsylvania-licensed engineer’s report with a remediation plan and construction details in place of full plans for a make safe permit.

How fast can L&I review a make safe application?

With a complete engineer’s report, an in-person application can often be reviewed while you wait. Plans submitted instead of a report are reviewed within about 5 business days.

What is a contractor narrative?

A written description from the contractor of the condition and the repair, accepted for small repairs such as replacing less than 10% of the joists, unless the notice requires an engineer.

Who hires the engineer?

The owner does, but your contractor can coordinate it. MatrixGC arranges the engineer as part of our make safe service.

Authors

  • Matrix Team
  • MatrixGC Team

    Written and reviewed by the MatrixGC team, a licensed and insured residential general contractor in Philadelphia (City of Philadelphia contractor license #43984) with more than 25 years of experience. We build home additions, 3rd-floor additions, kitchens, bathrooms, basements and decks, manage FHA 203(k) renovation projects, and pull our own permits across Philadelphia and South Jersey. Every guide is based on work we do on real homes.

    View all posts

Featured

Other Posts

Need Help?

Get In Touch

Comments

0 Comments

Matrix Blog Posts

Call us now!